
The Berlin Metropolitan School in Berlin-Mitte is housed in a pair of existing prefabricated structures from the GDR era, which were built in 1987 in "SBR 80" construction method that was widely used at the time. The project includes roof extensions on three of the existing buildings as well as a side extension at the entrance to the schoolyard. The new additional space provide rooms for offices, access to a roof garden, and a large auditorium where the main events of the school year are held.